PRODUCCIÓN COLPLAST

ISN Colplast Paint Division

www.grupoisn.com

ISN

Facilities

The COLPLAST facilities have grown to meet our customers' needs and now cover more than 3700 m2 of plant with modern Part Sanding, Washing, Painting and Assembly installations.

These installations are structured into separate area for each of the different production processes.

For part painting, Colplast has 3 painting lines, both of which are high capacity and capable of providing quality performance in line with modern-day standards.

These 3 painting lines allow Colplast to respond to all of its customers in terms of quality, capacity and the entire range of different part shapes and sizes. From small plugs to lorry-cab roofs.

There are also isolated areas for the part sanding process, performed using automatic sanding machines.

We also have installations suitable for the handling and storage of large-scale parts, vital to some markets.

ISN cuenta con:

Oficinas y vestuarios:
3 vestuarios y áreas de descanso: 250 m2
3 oficinas, 1 almacén y 2 en nave.: 300 m2
Superficie Edificada :
7305 m2 de planta
Naves de producción:
Nave de pintado 01: 620 m2
Nave de pintado 02: 620 m2
Nave de pintado 03 - Lijado : 925 m2
Nave de Tunel de Lavado: 790 m2
Almacenes:
2 almacenes de 1000 m2 y 2000 m2

 

Quality certification

Prices

Address: Ctra. Ajalvir / Torrejón, km.2 (Pol. Ind. Rafael Martinez - RAMARGA) - C.P. 28864 (Spain)
T. +34 91 884 48 48 - F. +34 91 884 48 48 isn@grupoisn.com

Aviso Legal